Extra Standard construction with cable ladder of the ceiling type

Overview

Example of the Extra Standard construction with cables in a cable ladder of the ceiling type- tested with the cables of BITNER.

Fastening with a threaded rod to the ceiling:

  • indirectly with an USOV grip and PSROM10 expandable sleeve bolt to the ceiling;
  • directly with the TRSOM10 expandable sleeves - no USOV grip required for a sleeve sunk min. 60 mm into the concrete foundation..

Extra Standard material of suspension: stainless steel .

Extra Standard cable ladder sheet thickness: 1,2 mm.

Extra Standard spacing of supports: 1,5 m.

Maximum load;20 kg/m.

Back to top ↑

Set elements

O.no. Product Symbol Item number Pcs in suspension
1 DGOD...H60E Cable Ladder DGOD400H60/3E 867240
1
 / 
3,0 m
2 SGK... Screw Set SGKM8x14E 661030
8
 / 
3,0 m
3 ZM/ZMO Hold Down Clamp ZM/ZMOE 300700
2
 / 
1,5 m
4 WMC/WMCO... Bracket WMC/WMCO400E 740040
1
 / 
1,5 m
5 UPW/UPWO Rod Grip UPW/UPWOE 803301
1
 / 
1,5 m
6 PGM... Threaded Rod PGM10/1E 652101
1
 / 
1,5 m
7 USV/USOV Rod Hanger USV/USOVE 805400
1
 / 
1,5 m
8 PP... Washer PP10E 652300
4
 / 
1,5 m
9 NS... Nut NSM10E 652200
4
 / 
1,5 m
10 SGK... Screw Set SGKM8x14E 661030
4
 / 
1,5 m
11 WPCW/WPCO... Ceiling Bracket WPCW/WPCO400E 750140
1
 / 
1,5 m
12 SM... Skrutka (komplet) SMM10x30E 652600
2
 / 
1,5 m
13 PSRO... Anchor Bolt PSROM10x80E 804101
3
 / 
1,5 m
As alternative to the complete set
14 PP... Washer PP10E 652300
2
 / 
1,5 m
15 NS... Nut NSM10E 652200
2
 / 
1,5 m
16 TRSO... Drop-In Anchor - Steel TRSOM10E 804801
1
 / 
1,5 m
Add selected to the project Add all to the project
Specify cable channel length [m]:
Calculate
Back to top ↑

Examples

Example of the Extra Standard construction with cables in a cable ladder of the ceiling type- tested with the cables of BITNER.

Extra Standard material of of suspension: stainless steel. .

Extra Standard cable ladder sheet thickness: 1,2 mm.

Extra Standard spacing of supports: 1,5 m.

Maximum load: 20 kg/m.

Fastening with a threaded rod to the ceiling:

  • indirectly with an USOV grip and PSROM10 expandable sleeve bolt to the ceiling;;
  • directly with the TRSOM10 expandable sleeves - no USOV grip required for a sleeve sunk min. 60 mm into the concrete foundation.
Back to top ↑